5.1Switching on and login

After the power supply has been established with the main switch on the front, the ICEcube boots up and you can connect via the web server or the display.

There are 2 login options: (default IP address: 192.168.222.91)

Web User, (password: IRSice): This access has read and write permissions. The ICEcube can be fully operated via the touch display or the web server.

Web Guest, (password: guest): Only read permissions are active here. The guest access prevents unintended operation during automated sequences. Here the parameters can only be viewed, and it provides insight into the status and error bits.

5.2Operating the ICEcube

The ICEcube can be controlled remotely via Modbus TCP, or it is operated via the web server interface or the touch display.

The following applies:

Gray buttons: these are control elements with which actions are carried out. Almost all actions require the enable, and they are locked in certain error states.

Green and yellow lights: status lights that show which function is currently activated

Blue light: info light; flashes when an action must be carried out (e.g., reset) or only as a general message when everything is ready.

Red light: error light; lights up when error states are present. After the error has been eliminated, the Reset button must be pressed.

5.3Main page

Freigabe (enable): Freigabe sets a global enable bit that enables all functions. It can also be used as an emergency stop function. The green light next to it shows whether Freigabe is active

Reset: Reset resets errors that have been eliminated. The status light indicates whether a reset is pending.

Auto Fill: This function activates automatic filling: after each blow-out of the DUT circuit, the system checks whether the fill level is back at maximum. If there is a deviation, the filling valve opens and water can be topped up. Filling is interrupted when the IceCube is in operation again or the maximum fill level has been reached.

Soll-Temp. DUT (target temperature DUT): This sets the setpoint for the cooling water temperature with which the DUT is to be temperature-controlled. The DUT cooling circuit is then controlled to this supply temperature.

Wassertemp. Haus (facility water temperature): Enter the external facility water temperature here to optimize the controller.

pH-Wert and Leitwert (pH value and conductivity): Allow conclusions to be drawn about the condition of the cooling water in the tank.

Ist-Temperatur, Ist-Durchfluss, Druck (actual temperature, actual flow, pressure): Measured values of the respective DUT circuits.

Pumpe (pump): Activates the cooling water pump

Ausblasen (blow out): The cooling circuit is cleaned with compressed air so that only a small amount of residual water escapes when the DUT is changed.

Dichteprüfung (leak test) The respective cooling circuit is pressurized with compressed air. Monitoring the pressure drop allows conclusions to be drawn about faulty connections or leaks.

Symbols Visualize the activity of the actions

Kreislauf befüllt (circuit filled) Indicates when the DUT circuits are filled with water.

5.4Configuration

Coupling the circuits: For requirements with high cooling capacity or high flow rates, the two cooling circuits can optionally be coupled in parallel. For trouble-free control, the yellow button “Kreise gekoppelt” (circuits coupled) must be activated.

Switch “Pumpe regelt auf” (pump controls to): Durchfluss, Druck (flow, pressure) This selects whether the ICEcube controls to a target pressure or to a desired flow. This function always affects both cooling circuits.

Soll-Temperatur (target temperature): As on the Home page, this sets the setpoint for the cooling water temperature with which the DUT is to be temperature-controlled. The supply temperature of the DUT cooling circuits is then controlled to this value.

Überdruck Schwellwert (overpressure threshold): Since the pumps can deliver a pressure of up to 9 bar, the pressure can be limited to protect sensitive DUTs. If this threshold is exceeded, the ICEcube switches off.

Soll-Druck (target pressure): Pressure to which the respective cooling circuit is controlled

Ist-Druck (actual pressure): Pressure currently measured in the respective cooling circuit

Soll-Durchfluss (target flow): Flow to which the respective cooling circuit is controlled

Ist-Durchfluss: Flow currently measured in the respective cooling circuit

T Korrekturfaktor (temperature correction factor): To compensate for possible tolerances of the temperature sensors, a (gain) correction factor can be stored here. (The default is 1)

T Korrekturwert (temperature correction value): To compensate for possible tolerances of the temperature sensors, an (offset) correction factor can be stored here. (The default is 0)

Ausblasen kontinuierlich (continuous blow-out): Here you can enter the blow-out duration in seconds during which the compressed air flows constantly through the circuits.

Ausblasen Pulsen (pulsed blow-out): Here you can enter the duration in seconds during which the compressed air flows through the circuits in pulses to achieve even better cleaning (approx. 2 s pulses).

5.5Error and status states

Not-Aus Extern (external emergency stop): Interlock Harting connector on the rear not plugged in; interlock loop in the overall system possibly open.

Fehler Überdruck (overpressure error): The error is triggered as soon as the threshold specified in the configuration is exceeded.

Fehler Übertemp. (overtemperature error): Error, water or heating element temperature too high

Füllstand <Min (fill level below minimum): Tank fill level too low

Füllstand Max (fill level maximum): Maximum tank fill level has been reached

Fehler FU (frequency converter error): Frequency converter of the pump is in an error state

fb Heizstab (heating element feedback): Feedback lights up when the heating element is activated.

Dichteprüfung i.O. (leak test OK): Leak test completed and passed

Dichteprüfung läuft (leak test running): Status lights up as long as the leak test is active

Temp. Heizstab (heating element temperature): Temperature measured directly at the heating element

Software Version: Shows the current LOGO PLC software version

5.6Maintenance information

Depending on the cooling medium, limit values can be defined for the pH value and conductivity.

As soon as these are violated, we recommend replacing the coolant.

The filters should be cleaned regularly. At the same time, the liquid can be checked for discoloration and residues in the water.

As soon as cooling capacity and flow rates are impaired, we recommend flushing the circuits and renewing the liquid.