Maintenance and Cleaning

General:

The following notes concern the servicing and maintenance of the test systems.

7.1Servicing

  • Inform the operating personnel before starting special and servicing work.
  • If the test system is switched off during maintenance and repair work, it must be secured against unexpected restarting.
  • Tighten any screw connections loosened during maintenance and servicing work.
  • If safety devices have to be removed, they must be reinstalled and checked immediately after the work has been completed.
  • Servicing activities may only be carried out by personnel suitable for this purpose.
  • During servicing work in the area of the control system, wear protection suitable for ESD-sensitive assemblies (electrostatic sensitive devices).

7.2Maintenance schedule

The following sections describe the maintenance work required for optimum and trouble-free operation.

If you have questions about maintenance work and intervals, contact the manufacturer.

Part/component/unitActivityMethodDailyWeeklyMonthlyYearly
Accessibility of all areas of the system?Check -> RemedyVisualx
Entire system: switches, plugs, screw connectionsCheck for damageVisualx
CoversCheck for presence and damageVisualx
Foreign bodies/objects in the system?Check -> RemoveVisualx
Foreign bodies in the waterInspect -> Drain, flush, change waterTestx
Cooling water levelCheck -> Top upTestx
Filter in the supply lineCheck -> Clean/replaceTestx

7.2.1Foreign bodies in the storage tank

Check the condition of the water:

  • if available, check the data of the pH sensor and the conductivity sensor
  • visual inspection for discoloration, dirt and algae growth