Kapitel 1.1.1 · LTT

IRS Life Time Tester user manual

Diese Seite gibt es noch nicht auf Deutsch, daher wird die englische Fassung angezeigt.

Kapitel 1.1.1.1

System Overview

A life time tester (LTT) is an electric control cabinet, whose purpose is to perform long term electrical tests on various electrical devices (so called devices under test, or short DUT) under certain environmental conditions (temperature, humidity, etc.). One can say, it simulates the aging process or lifetime of an electrical device.

The IRS LTT software, which comes with every IRS life time tester is composed of several parts.

System Overview

This is the documentation of the IRS LTT software, including the graphical user interface (GUI), the TestStand sub system and all other related components.

Kapitel 1.1.1.2

Folder structure

After installation you will find a certain folder structure below your root installation folder.

Folder Structure

FolderContent
10_LTT_ResultsLocation of the history files (more info).
20_LTT_Data_LogsLocation of various measurement data files.
30_LTT_Comm_LogsLocation of various DUT communication logs (currently not used).
40_LTT_Sys_LogsSystem log files.
50_LTT_SWThe LTT GUI software + TestStand root + Configuration files.
55_LTT_MDBSThe measurement database system (more info).
60_LTT_Action_LogsSee chapter about Action Logs.
66_LTT_ToolsSome tools.
77_LTT_DocumentationThe LTT documentation.

The 50_LTT_SW folder content is like below:

FolderContent
LTT ConfigLocation of all LTT configuration files (more info).
LTT GUILocation of the LTT GUI & LTT MesVis executables.
LTT Limit FilesLocation of all LTT limit configuration files (more info).
LTT TSThe TestStand root directory (more info).
Kapitel 1.1.1.3

Initial Setup Guide

If you start a brand new LTT GUI installation for the first time you need to perform certain setup tasks before you can load and run a LTT TestStand sequence file.

Main Window

Although the GUI assists you with this task by displaying various messages, an overview of the minimum steps needed to run a LTT TestStand sequence file is given right here.

Each of the below steps links to the corresponding chapter in which the required action will be explained in detail. In each of those chapters a back link to this setup guide is provided, so you can easily jump between the setup guide and the individual topics.

For the first 3 steps the LTT GUI may not be open. Please close the GUI if you have it currently open.

StepActionLocation
1Set project nameMain configuration file
2Setup driversModule configuration file
3Setup DUT signalsMesSy configuration file
4Create test stationsF3 - project wizard
5Define DUT typesF3 - project wizard
6Define test groupsF3 - project wizard
7Define / import signalsF3 - project wizard
8Define limitsF5 - limit configuration
9Define operation modes and parametersTestStand sequence file
10Load a TestStand sequence fileMain window
11Create a TCC <> operation mode mappingF10 - test parameter configuration
12Assign DUTs to test stationsF11 - test configuration
13Start testMain window