# F3 - project wizard

URL: https://irs.systems/en/docs/ltt/documentation/ltt-gui-manual/lttgui/dialogs/f3projectwizard

The project wizard guides you through the most basic settings of your individual LTT project and is usually performed only one time during the [initial setup](/en/docs/ltt/documentation/ltt-gui-manual/gettingstarted/initial-setup-guide) of your LTT.

> You need a password to enter the project wizard. Ask IRS for the password.

![Login](/docs/assets/ltt/assets/dlg-login.png)

The project wizard is composed of 4 steps:
- [Definition of test stations](/en/docs/ltt/documentation/ltt-gui-manual/lttgui/dialogs/f3projectwizard/teststationconfiguration)
- [Definition of DUT types](/en/docs/ltt/documentation/ltt-gui-manual/lttgui/dialogs/f3projectwizard/duttypesconfiguration)
- [Definition of test groups](/en/docs/ltt/documentation/ltt-gui-manual/lttgui/dialogs/f3projectwizard/testgroupsconfiguration) (and the assignment of power supplies / temperature sensors to that groups)
- [Definition of signals](/en/docs/ltt/documentation/ltt-gui-manual/lttgui/dialogs/f3projectwizard/signalsdefinition) (and the assignment of those signals to individual DUT types)
